Completed projects
Modernization of the pumping system of the well in the village of Piatra AlbaDismantling the old pumping system and replacing it with an efficient system of German origin. Nominal flow at the working point 25m3/h. Automation of the water tower filling system through a 4-20mA pressure sensor.
Installation of the well pumping system and the water distribution pump in the aqueduct in the village of VisocaInstallation of the water pump system from the well into the water tank in automatic mode. E-Tech pump with a productivity of 10 m3/h and automated with XTREME protection panel. An E-Tech brand stainless steel pump driven by a TREVI brand frequency converter was installed to supply water to…Forarea sondei arteziene satul Tartaul de Salcie
Modernization of the pumping system of the wells in the village of Ermoclia
Modernization of the pumping system of the well in the village of Bardar
Drilling the artesian well in the village of Åžeptelici and installing the water distribution system to consumers
Modernization of the pumping system of the wells in the village of Ermoclia
Modernization of the pumping system of the well in the village of Bardar
Drilling the artesian well in the village of Åžeptelici and installing the water distribution system to consumers
Drilling of the artesian well Stețcani village and installation of the water castle with the water distribution system to consumersAs part of the given project, works were carried out to drill an artesian well to supply drinking water to the village of Stețcani, install the water castle with a volume of 50 m3 and the water distribution system to consumers. A water treatment station was also installed to reduce its hardness and…
Drilling the artesian well in the city of Otaci and installing the submersible pumpDrilling the artesian well in the city of Otaci with a flow rate of about 20 m3/h. Installation of the Franklin Electric submersible pump, together with the Salupo remote control and automation system.Connecting the artesian to the consumers' water supply system, installing a chlorine water…Rehabilitation of the artesian well and the water pumping system for consumers in the village of Horești
Installation and connection of the sewage station, Forăști village, Suceava county
Installation of the pumping system and the control panel in the village of Step-Soci
Installation of the pumping system for the water supply of the artificial pool in the city of Briceni
Installation and connection of the sewage station, Forăști village, Suceava county
Installation of the pumping system and the control panel in the village of Step-Soci
Installation of the pumping system for the water supply of the artificial pool in the city of Briceni
Rehabilitation of the water pumping system from the artesian well, Tocuz villageThe modernization of the pumping system from the artesian well for water supply to the inhabitants of the village of Tocuz, was highlighted by the replacement of the submersible pump with a capacity of 12m3/h completed with a Franklin Electric motor of 11kW, at the same time there was a change of…
Rehabilitation of the water supply system from the artesian well Zaim villageThe rehabilitation of the water supply system from the artesian well took place by changing the submersible pump with a capacity of 24 m3/h equipped with a 15kW Franklin Electric motor. At the same time, the power cable of the electric motor was also changed. The manhole of the concrete well was…